BuyHome.ge

BLOG

+995 595 33 78 33

How to Accept Work and Close the Renovation: Acts, Punch List, Final Payment

Осмотр квартиры при приёмке ремонта

How to Accept Work and Close the Renovation: Acts, Punch List, Final Payment

How to accept renovation work and close the project ✅

Accepting renovation is a critical moment. Careful inspection and clear documentation protect your home quality and your money. Below is a practical, step-by-step approach that contractors, buyers and investors can use.

Prepare before the walkthrough 🛠️

  • Schedule the inspection during daylight and when all systems (water, electricity, heating) are operational.
  • Bring basic tools: flashlight, level, tape measure, notebook, and a smartphone for photos and video.
  • Invite the contractor or site supervisor to attend the walkthrough.

Compact inspection checklist 🔎

  • Walls and ceilings: look for cracks, uneven surfaces, moisture stains or peeling.
  • Floors: verify evenness, proper tile or plank installation, and soundness underfoot.
  • Windows and doors: check sealing, hardware function, and smooth operation.
  • Electrical: test outlets and switches, check light fittings, and listen for unusual sounds in panels.
  • Plumbing: check for leaks, secure fittings, proper drainage and functioning valves.
  • Finishes: grout lines, paint consistency, trims and caulking.
  • HVAC and ventilation: visible ductwork, filter access and baseline operation.
  • Small details: baseboards, thresholds, locks and small cracks.

Always photograph every defect with a short note and timestamp — it is the strongest documentary evidence.

Acceptance act and punch list — what to include 🧾

  • The acceptance act should list: date, address, attendees, summary of completed work, and references to the contract and scope.
  • If there are issues, attach a punch list that describes each defect, its priority and a proposed deadline for correction.
  • Specify preferred communication channels and contact details for the contractor.
  • Signatures from both parties are essential. If the contractor refuses to sign, record that fact and sign in the presence of witnesses.

Handling the final payment safely 💳

  • Avoid paying the entire remaining balance before critical defects are fixed. Agree on a retention amount or staged payment tied to defect correction.
  • Record payment conditions in the acceptance act, including criteria for a follow-up inspection.
  • Use bank transfers or traceable payments and keep receipts as proof of settlement.

Warranties and timelines — protect future rights ⏱️

  • Obtain written warranties for workmanship and for materials when possible, plus manuals and certificates for installed equipment.
  • The contract should allow a reasonable period after acceptance for fixing defects; keep a clear log of all requests and responses.

If defects are not fixed — practical steps ⚖️

  • Send a written notice with the punch list and a reasonable deadline to the contractor.
  • If there is no response, hire an independent expert to assess defects and prepare an expert report.
  • Consider mediation or legal advice if the issue remains unresolved; keep all correspondence and reports.

Sample sentences to use in documents

  • “Acceptance completed with remarks listed in the attached punch list, which shall be remedied within the agreed timeframe.”
  • “Final payment will be released upon signing an act confirming full defect remediation or upon handover without remarks.”

Final tips and reassurance 🎯

  • Don’t rush the final sign-off — a careful inspection can prevent repeated costs and stress later.
  • Keep all receipts, warranties and photos stored in one place for easy access during warranty claims.
  • Communicate clearly and keep written records of every agreement with the contractor.

Need help inspecting or closing a renovation project? BuyHome can assist with checklists, document templates and negotiations with contractors. Contact us to get professional support and make sure your home is accepted correctly.

Explore available apartments or start your property search: https://buyhome.ge/en/searchhttps://buyhome.ge/en/apartments

Date added: 06.01.26

Related articles

How to Choose a Renovation Crew in Batumi: 12 Questions Before You Start

Read

Renovation Contract with a Contractor: Key Clauses, Deadlines, Warranty

Read

Stage Payments: How to Set a Payment Schedule Without Conflicts

Read

Technical Supervision in Georgia: When You Need It and How Much It Costs

Read

Where to Find a Contractor in Batumi: Recommendations, Chats, Reviews Check

Read

Does the Contractor Buy Materials or You: Pros, Cons, and Control

Read

Related categories

Renovation costs

A practical guide to apartment renovation costs in Georgia—labor and materials, timelines, common pitfalls, and how to control your budget.

Read

Choosing a contractor

How to choose a renovation contractor in Georgia: where to look, what to verify, and how to control quality so you don’t lose time or budget.

Read

Interior

Interior trends in Georgia, layouts, and practical apartment solutions: how to choose a style, plan zones, and create a design that works for living or renting.

Read

Benefits of buying property on BuyHome.ge

Best property prices

No commission for buyers

Up-to-Date Properties on the Website

Free property selection

Free transaction support

Free expert consultations

Submit a Request
for a Consultation!

Your phone number: *

2026 © All rights reserved