Renovation timelines: set realistic expectations 🛠️
Renovation is a sequence of design, demolition, technical works and finishing — plus procurement and inspections. Building a weekly plan that accounts for overlaps and buffers helps reduce surprises. Below is a practical structure and tips to manage time and stress.
Project structure to keep in mind ✅
- Preparation and design: scope, material selection, estimates.
- Demolition and surface prep.
- Rough works: electrical, plumbing, plaster, screeds.
- Flooring and tiling.
- Installation of kitchen, sanitary ware and built-ins.
- Painting, trims and final cleaning.
- Handover and defect rectification.
Realistic weekly plan — illustrative ranges 📅
The plan below is an example, not a fixed timetable. For many apartments a sensible renovation timeline is built from overlapping blocks:
-
Preparation and ordering materials — 1–3 weeks
- Define scope, finalise finishes and order long-lead items (kitchen, large tiles).
- Tip: order items with long delivery times early on.
-
Demolition and base prep — 1–2 weeks
- Remove old finishes, clear rubbish, and prepare surfaces.
-
Technical works (electric, plumbing) — 1–3 weeks (can overlap)
- Run cables, pipes, and install distribution boards; allow time for testing.
-
Plastering and screed works — 1–3 weeks
- These require drying time; factor that into the schedule rather than rushing.
-
Tiling and flooring — 1–2 weeks
- Proper substrate preparation is often more important than speed.
-
Installation of kitchen and fixtures — 1–2 weeks
- Fit kitchens and sanitary ware after walls and floors are ready.
-
Painting and final finishes — 1–2 weeks
- Finish in clean, dry conditions to avoid paint failure.
-
Handover and corrections — 1–2 weeks (contingency)
- Use a checklist to document defects and deadlines for fixes.
Managing buffers and delays ⚠️
- Build slack between major stages to absorb delays without cascading effects.
- Delivery times can vary by season in Georgia — plan earlier for key items.
- Re-prioritise tasks when a key supplier or trade is delayed; some tasks can be done in parallel.
Time- and cost-saving tips 💡
- Create a detailed materials spec to avoid late changes and rework.
- Choose reliable local suppliers to reduce delivery time, but inspect quality personally.
- Pre-approve finishes before work starts.
- Hold intermediate inspections after each major stage.
Handover checklist for owners 📝
- Is there an approved estimate and weekly plan?
- Who is responsible for purchases and deliveries?
- What contingency time is included for unexpected works?
- Are defects recorded in writing with deadlines for correction?
Common causes of schedule slips and how to avoid them 🚧
- Missing items or delayed deliveries — mitigate with a full spec and early orders.
- Design changes mid-project — manage scope changes with documented variations and timelines.
- Weather for external works — schedule exterior tasks in dry periods.
Quick action plan for owners 🏁
- Define scope and prepare a basic estimate.
- Order key finishes and long-lead items early.
- Conduct staged inspections and keep written records of issues.
- Maintain a time buffer and financial reserve.