BuyHome.ge

BLOG

+995 595 33 78 33

Rogantini Swiss Village construction timeline: project stages and completion date

Сроки строительства Rogantini Swiss Village: этапы и сдача

Rogantini Swiss Village construction timeline: project stages and completion date

Construction timelines for Rogantini Swiss Village are one of the key questions for buyers who are planning a move, seasonal living, or an ownership strategy with future rentals. Below is a clear overview of the work stages, estimated timeframes, and how you can track construction progress in real time.

Construction stages of Rogantini Swiss Village

The project is being delivered step by step — from core structural works to engineering and finishing, and then to final completion.

2024: foundation and monolithic frame works

The initial stage includes foundation works and building the load-bearing frame — the base that defines geometry, stability, and the quality of all subsequent stages.

2026: finishing works

After the main structure is completed, the project moves into finishing and final preparation of spaces. At this stage, internal and engineering works are typically active, and the complex’s overall look and common areas take their final shape.

2027: project completion

The estimated completion and handover timeline is 2027.

Current stage: glazing and development of key infrastructure elements

At the next construction stage, glazing begins — the installation of panoramic façade structures that support wide views and indoor comfort.

At this stage, the following solutions and materials are used:

  • base insulation with high-density stone wool for warmth and sound insulation
  • waterproofing and sealing using stainless steel sheet and Soudal silicone
  • vertical junction details with double-sided Soudal membrane and additional stone wool
  • European-made aluminum sliding systems with an enhanced thermal break
  • energy-efficient Belgian glazing units for comfort in cooler months
  • reliable European-grade mechanisms for long-term operation

Work on site is ongoing, including polishing red concrete slabs for a smooth surface and earthworks for the future pool.

Open construction: how to check the pace without “perfect footage”

A practical way to monitor progress is a live camera, which allows you to see in real time:

  • the current stage of works
  • activity on site
  • the actual construction pace

This is especially convenient for buyers and investors who are outside Georgia.

What affects the construction schedule

To keep expectations realistic, it helps to understand that construction timelines depend not only on the year-by-year plan, but also on parallel factors such as:

  • logistics of materials and equipment
  • the sequence of engineering stages (so finishing doesn’t “run ahead” of utilities)
  • weather conditions for certain types of work
  • synchronization of construction with the launch of the complex’s infrastructure

Summary

Rogantini Swiss Village timelines follow a clear logic:

  • 2024 — foundation and monolithic frame works
  • 2026 — finishing works
  • 2027 — project completion

And current work on glazing and site development, along with the option to watch progress via a live camera, helps you evaluate the construction dynamics already today.


Ready to discuss your options? Leave a request in the form below or contact us — we’ll help you choose the optimal strategy and select suitable options in Rogantini Swiss Village: https://buyhome.ge/RogantiniSwissVillage

Date added: 21.02.26

Related articles

Rogantini Swiss Village: Chakvi complex overview (location, amenities, services)

Read

Rogantini Swiss Village layouts and turnkey packages: finishes and Smart Home

Read

Rogantini Management and concierge service: owner support and property management

Read

Rogantini Swiss Village developer price growth: how pricing changes by stages

Read

Rogantini Swiss Village investment potential: use scenarios and capital appreciation

Read

Rental returns in Rogantini Swiss Village: short-term vs long-term, seasonality, costs

Read

Related categories

Rogantini Swiss Village

A curated set of articles about Rogantini Swiss Village in Chakvi: complex reviews, layouts and turnkey delivery, services and management, construction timeline, developer pricing, investment potential, and rental returns.

Read

Benefits of buying property on BuyHome.ge

Best property prices

No commission for buyers

Up-to-Date Properties on the Website

Free property selection

Free transaction support

Free expert consultations

Submit a Request
for a Consultation!

Your phone number: *

2026 © All rights reserved